
PRODUCT FAMILY
Clear-span tents
Open structural layouts for storage, covered operations and events. Develop the geometry, envelope and delivery scope around your project brief.
Explore this structureRoom for every movement.
Covered courts, training halls and recreational facilities. Set the playing envelope, the run-off zones and the lighting strategy before the structure is defined.
Email for a QuoteGeometry, materials and performance are defined by the approved project brief.

A sports space is defined by what happens inside the lines and around them. Court dimensions, run-off zones and ceiling height all follow the sport and its governing rules, so these are established before the structure is chosen.
Internal columns are a distraction and, for many sports, a hazard. A clear-span approach removes them from the playing area, so the structure disappears from the athlete's view and the floor stays open.
Lighting uniformity, glare and air movement all affect how a space plays. These service requirements are treated as design inputs and coordinated with the structure so the hall performs on match day, not just on paper.
Floor systems, drainage and the surrounding site all matter, especially for outdoor or semi-open facilities. Ground conditions, anchorage and the intended service period are agreed early with the project engineer.
PROJECT QUESTIONS
Yes, where the brief allows. Multipurpose use requires the largest clear height, run-off and lighting requirement to be identified up front, since that combination sets the controlling design case.
The floor system and playing markings are normally specified by the sports-surface specialist or your operator. They are treated as design inputs that interface with the structure and the building envelope.
Enclosed, open-sided and semi-open arrangements are all possible, but the exposure and the intended service period change the structural and envelope approach. These must be defined for the site.
LET'S TALK SPACE